15M - 60M Telecommunication Post,Monopole Tower Used For Airport
Product Description
Our telecommunication poles at Futao are designed to be used in various fields such as cellular communications, broadcasting and telecommunications. Telecommunication poles can either be base plate mounted or use a direct burial mounting method. All baseplates will be made in accordance to ASTM A633 GRE standard for Normalized High Strength Low-Alloy Structural Steel Plates. In addition, the shape of the poles can be configured in a number of options including round and multisided tapering. For those looking for a more aesthetic look, we have disguised towers that will blend in seamlessly in any location (please contact us for more details).
Products Specifications
Products Name | 15M - 60M Telecommunication Post,Monopole Tower Used For Airport |
Height | 15-60M |
Design wind | 160KM/H or depending on clients requirements |
Applications | Telecommunication, wireless internet,Camouflaged,Decorated,Lighting |
Application place | Airport,Plaza Etc |
Camouflaged Monopole Advantages | 1)The Monopole structure is exquisite, and the appearance is beautiful. 2)Strong structural stability and good technicality. |
Work Platform | The Work Platform Layers Quantity Depending on the antennas installations Quantity/Size/Weight |
Luminaries installation | 6 Nos LED lights evenly distributed in 360 degrees shall be fixed on pole cap at top |
Strip elements for fiberglass shroud |
Channel 50mm x 10mm x 4mm thick, of length 3m shall be fixed on frame of diameter 2.5m,or depending on specifications requirements. |
Shape | Conical, Polygonal |
Length of per section | Within 14m once forming without slip joint |
Safety Factor | 1.5,1.7,2.0 etc |
Material | Q235, Q345, Q420, Q460, ASTM A527 A36, GR50, GR65, ST-37, ST-44, ST-52, S355JR, S355J2G3, SS41, SS50, SS55 |
Surface Treatment | Hot Dip Galvanization in accordance with Chinese Standard GB/T 13912-2002 or American standard ASTM A123 or AS/NZS 4680:2006 or BS EN ISO 1461 and different Color Powder Coated. |
Connection Method | Slip joint by lower section insert into upper section |
Flange connect to flange(outer flange/inner flange) | |
Climbing Ladder | Inner Climbing Ladder/Nail |
Outer Climbing Ladder/Nail | |
Wall Thickness | 2~30mm |
Welding | Welding complies with AWS D1.1 standard. CO2 Welding or Submerged Arc Auto methods No fissures, scars, overlaps, layering or other defects |
Welds slags removing | Burrs or sharp edges shall be removed,all welds shall be cleaned mechanically against slag and spatters before hot dip galvanizing. |
Mounting Method | Direct Burial/With Base Template and Anchor Bolts |
Base plate | Base plate is square/round/polygonal with slotted holes for anchor bolts or according to clients’ requirement. |
Life Expectancy | More than 25 years depending on various environmental factors |
Installation & Maintenance
Easy Installation and maintenance.
More Details we will send the video to our clients how to install and maintain.
Process of Production
Verification of Materials → Cutting → Molding or Bending → Vertical Welding → Verification of Dimensions → Flange Welding → Hole Drilling→ Calibration → Deburring Process → Galvanizing, Powder Coating or Painting → Recalibration → Threading → Packaging
Packaging & Shipping
We cover the top and bottom parts of the pole with a mat or straw bale in order to protect it from damage to the galvanized surface that may occur during transportation. Packaging can also be done according to clients’ requirements.