Custom Made Steel Utility Pole 18 Meter Height With Black Epoxy Paint
Product Description
The products above are steel utility poles made specifically for power distribution between 10KV to 550KV.
To design in accordance with PLS software, we will require the following design parameters:
Schedule for the appropriate line items at the respective quoted rates. Where in the case of no specific rate is given for a particular spare item in the Schedule, such item shall be supplied by the Contractor at a rate based on comparable Schedule rates. If any spare should be ordered after the date of the Taking-over Certificate, the price may be subject to mutually agreed adjustment. Any spare material so ordered is to be strictly interchangeable with the parts for which it is intended, packed or treated in such a manner so as to be suitable for storage in the climate at the Site for an indefinite period and each part is to be clearly marked for identification purpose outside the package where applicable. Spare tower or support material is to be delivered in sets for each individual tower or support. Spare conductor and OPGW are to be provided on drums protected as specified and treated in an approved manner to resist termite and fungus attack. Spare material so provided must be delivered to such stores as may be nominated by the Principal and delivery will not be deemed to be complete until the packaged material has been checked by a representative of the Principal and a receipt obtained. Prior to the handing over date for the contract spares, the Contractor shall be responsible for all security arrangements and the safe custody of the spare materials. The works under this contract form part of a comprehensive project and the Contractor is to cooperate with other contractors as may be necessary. This Contract also provides for all parts of the work to be completed in every respect for commercial operation to the requirements of the Department of Electrical Services, Negara Brunei Darussalam. Notwithstanding that any details, accessories, etc. required for the complete installation and satisfactory operation of the Plant are not specifically mentioned in the specifications, such details are to be considered included in the Contract Price. Unless stated otherwise, this Contract does not include substation work of any nature with the exception of connections to gantry structures, terminations of 66kV underground cable circuits on support lattice structures at the substation or the provisions of and connections to down dropper anchor blocks, where required.
B. Load Testing | ||||||||
% Load | Load (kg) | Act. Load (kg) | Time (min.) | Deflection (mm) | Recovery (mm) | Remarks | ||
40% | 512 | 513 | 1 | 1105 | 42 | No sign of failure or damage | ||
50% | 640 | 642 | 1 | 1385 | 55 | |||
70% | 896 | 897 | 2 | 1920 | 73 | |||
80% | 1024 | 1026 | 2 | 2182 | 78 | |||
85% | 1088 | 1088 | 2 | 2305 | 82 | |||
90% | 1152 | 1152 | 2 | 2438 | 83 | |||
95% | 1216 | 1216 | 2 | 2565 | 93 | |||
100% | 1280 | 1280 | 2 | 2700 | 104 |