| Brand Name: | Futao |
| Model Number: | FT-391 |
| MOQ: | 1 |
| Price: | 1000-4500USD Per set |
| Delivery Time: | 30days |
| Payment Terms: | L/C, T/T |
Hot‑Dip Galvanized High Mast Lighting Pole – EN 40 / ANSI C136 Compliant, 15‑50m for Airports, Ports, Highways & Stadiums
Our high mast lighting poles are heavy‑duty steel structures for large‑area illumination – highways, seaports, airports, stadiums, and industrial zones. Manufactured with Q345B steel and hot‑dip galvanized per ASTM A123 (85‑100µm), they provide wide coverage with fewer installations. Height: 15‑50m (custom to 80m). Design life: 25+ years. ISO 9001:2015 certified facility.
Local supply shortage – Southeast Asia’s infrastructure boom (airports, ports, highways) outpaces domestic manufacturing capacity.
Harsh environment – Tropical humidity, salt spray, and typhoon winds (up to 180 km/h) corrode standard poles within 5‑7 years.
Fragmented compliance – Each ASEAN country enforces different standards (SNI, TIS, QCVN, etc.) – navigating them delays projects.
High maintenance costs – Fixed poles require cranes for luminaire replacement; raising/lowering systems are needed but many suppliers lack the expertise.
Rapid infrastructure spending – Asia‑Pacific leads the global market with 30% share and 8.4% CAGR. Local steel processing cannot meet EN 40 / ANSI C136 requirements. Most imported poles use insufficient galvanization (50‑60µm) and ignore typhoon wind loads, leading to early failure. No mutual recognition of standards among ASEAN nations.
International standards compliance (certification support provided):
| Standard | Scope |
|---|---|
| EN 40‑3‑1 / EN 40‑4 | Lighting column design & wind loads |
| ANSI C136 | Roadway/area lighting equipment |
| ASTM A123 / ISO 1461 | Hot‑dip galvanization |
| AWS D1.1 | Welding |
| ISO 9001:2015 | Quality management |
Our production aligns with each country’s technical requirements. We supply full technical dossiers (mill certificates, structural calculations, weld maps, galvanization reports) to support your local partner’s certification application in Indonesia, Thailand, Vietnam, Philippines, Malaysia, or Singapore.
Key advantages:
Superior corrosion protection – 85µm (inland) / 100µm (coastal) galvanization
Raising/lowering system – Motorized winch for ground‑level maintenance, cuts costs by up to 60%
Typhoon‑rated – Validated for 180 km/h wind loads via FEA per EN 40‑4
| Parameter | Value |
|---|---|
| Height | 15‑50m (custom to 80m) |
| Steel Grade | Q345B (yield ≥345MPa); Q235B optional |
| Shape | Octagonal / Polygonal tapered |
| Wall Thickness | 4‑30mm (tapered) |
| Surface | Hot‑dip galvanized, 85‑100µm |
| Design Standard | EN 40‑3‑1 / EN 40‑4, ANSI C136 |
| Wind Resistance | Up to 180 km/h |
| Design Life | 25+ years |
| Welding | AWS D1.1 |
| Quality | ISO 9001:2015 |
| Scenario | Recommended Configuration |
|---|---|
| Highways & expressways | 30‑40m raising/lowering, 6‑12 luminaires |
| Seaports (salt spray) | 35‑50m raising/lowering, 100µm galvanization |
| Airports (aprons, cargo) | 40‑50m raising/lowering + aviation obstruction lights |
| Stadiums & public squares | 25‑45m raising/lowering, multiple crowns |
Structural analysis – FEA per EN 40‑4 wind load requirements.
Material selection – Q345B with mill test certificates.
Fabrication – CNC rolling, submerged arc welding, polygonal taper.
NDT inspection – Ultrasonic/MPI of critical welds per AWS D1.1.
Hot‑dip galvanization – 450°C zinc bath, thickness verified per ASTM A123.
Raising/lowering system – Winch, cables, locking mechanism installed and load‑tested.
Quality check – Dimensional, coating, mechanical tests.
Sectional shipping – Containerized (max 14m per section), bolted assembly on site.
| Your Condition | Recommended |
|---|---|
| Highways / large open areas | 30‑40m raising/lowering, 6‑12 lights |
| Coastal ports (salt spray) | 35‑50m raising/lowering + 100µm galvanization |
| Airports (height limits) | 40‑50m raising/lowering + aviation lights |
| Budget‑sensitive projects | Fixed pole, Q235B steel |
| First‑time importer | Standard 30m raising/lowering – most versatile |
Q1: Do you hold local certifications (SNI, TIS, etc.)?
No – but we manufacture to those specs and provide full technical documentation (mill certs, structural calcs, weld maps, galvanization reports) to support your local partner’s certification application. We coordinate with local labs and can arrange factory audits.
Q2: Fixed vs raising/lowering – what’s the difference?
Raising/lowering uses a motorized winch to lower the luminaire ring to ground level for maintenance – no cranes needed, cutting maintenance costs up to 60%. Fixed poles require aerial lifts.
Q3: MOQ and lead time?
MOQ: 10 poles. Lead time: 30‑45 days after order confirmation and drawing approval.
Q4: Can you customize?
Yes – height, diameter, steel grade, coating thickness, raising/lowering or fixed, color (powder coating), and foundation design all customizable.
Q5: Quality assurance?
ISO 9001:2015 processes; NDT weld testing; coating thickness verified; raising/lowering load testing. SGS/BV inspection available at buyer’s cost.
Q6: Shipping?
Sectional packaging, containerized. Shipped from Shanghai/Ningbo/Guangzhou to major ASEAN ports. We handle export documentation.
10+ years exporting steel lighting poles to Southeast Asia
In‑house engineering – EN 40, ANSI C136, IEC expertise
Raising/lowering system specialist – motorized winch & manual options
Full customization – design to logistics
Certification support – technical dossiers for ASEAN approvals
![]()
![]()
![]()
![]()
![]()
![]()
Process of Production
Verification of Materials → Cutting → Molding or Bending → Vertical Welding → Verification of Dimensions → Flange Welding →
Hole Drilling → Calibration → Deburring Process → Galvanizing, Powder Coating or Painting → Recalibration → Threading → Packaging
![]()
Product Details Testing
![]()
Packaging & Shipping
We pack the top and bottom parts of the pole with a mat or straw bale in order to protect it from damage to the galvanized surface that may
occur during transportation.
Packaging can also be done according to clients’ requirements.
We can ship the poles by sea or air or express or trains and we have our regular shipping agent.
Export Market
Asia-Pacific, Central & South America,North America, Europe, Middle East, Africa
FAQ
Trade terms:
1. Price Term: EXW,FOB,CFR,CIF,FCA or others.
The price includes pole shaft, base plate, cross arm and anchor part.
2. MOQ: 1 sets.
3. Payment: 30%T/T in advance,70%T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Package: Plastic woven bag or old blanket or according to clients requirement.
5. Delivery time: within 30-60 workdays after receiving deposit.
Our Service
| Q1. Why choose us? |
| A: We offer high quality products at competitive prices. Furthermore, we allow for flexible payment terms. |
| Q2. How do you ship the goods and how long does it take to arrive? |
| A: We ship through the Shanghai port and it will take 2 weeks on average from the date of order. |
| Q3. How do I place an order for High Mast Lighting Pole? |
| A: Please provide specific details and requirements to us and we will proceed to give you an accurate price quotation. |
| Q4. Is it OK to print my logo on Led Light product? |
| A: Yes. Please inform us formally before our production begins and confirm the design first based on our sample. |
| Q5. How do I deal with faulty components? |
| A: Our products go through a rigorous quality control phase to prevent any defects or faulty components. However, during the guarantee period, we will send new lights for smaller quantities. For defective batch products, we will repair them and resend them to you or discuss an appropriate solution with you depending on the situation. |
1. We will reply all your enquiries in 12 working hours.
2. Experienced staff members will answer all your questions in fluent English.
3. We have experienced and professional design team. UEM & UBM are welcome.
4. Exclusive and unique solutions can be provided to our customers by our well-trained and professional engineers and staff.
5. Special discount or comission and protection of sales are provided to our distributors.
6. State of the Art Factory with highly specialized machinery focused on producing various types of steel poles with over 20 years of experience and expertise to deliver you quality products that you can trust at competitive prices.
7. We have our own inspection team to control the quality.
Welcome to our factory!